This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

How To

Dekwall

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

Important Information

This is a short version of the installation instructions, for complete information please download the installation instructions file. Read Instructions Donwload

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject
  • Wicanders Dekwall coverings are intended for indoor use only;
  • Store tiles at room temperature for at least 48 hours in its original package;
  • Remove plastic wrapping only when ready to install;
  • Room temperature must be at least 18ºC and 35-65% RH before, during and after installation;
  • Check that the substrate is absorbent;
  • Shuffle the tiles in order to obtain the most pleasant blend of shades;
  • Use recommended contact adhesives.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

Before Starting

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

Transport, storage and acclimatization

The cartons should be transported horizontally and the tiles and the adhesive should be acclimatized at the job site 48 hours prior to installation.

The temperature should be kept in a range between 18ºC and 28ºC (65ºF to 82ºF) and relative humidity from 35% to 65% during storage and installation.

Site inspection

Inspect the tiles in daylight for any visible faults or damage and also check the substrate and site conditions.

Substrate preparation

Substrate must be levelled, smooth, permanently dry, firm and free of cracks, dirt and adhesion-inhibiting substances.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

During Installation

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

Installing

See our tutorial video of the full process

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Find out more here.

We found an Wicanders website for your location, do you want to be redirected ?

Accept Reject

What are you looking for?

  • Install

    Learn step by step how to install Wicanders product and get all the information you need.

  • Maintain

    Maintaining Wicanders Floors is extremely easy, learn how to do it.

  • Repair

    Easy to Install and easy to Repair. Check out how to do it.

Este campo e obrigatorio
Pesquisa